National Trust, Helford
Comments Off on National Trust, HelfordRe-roofing project on a stunning National Trust property situated in the Helford.
Re-roofing project on a stunning National Trust property situated in the Helford.
Tremough Sports Centre had its open day yesterday. Evolution installed all the ceilings & partitions for Midas.
Scope of works: re-render feature walls including a curved seating area and paint upon completion, repair and re-stain timber decking, install two new timber gate sets. All works within the stunning feature area adjacent to the main entrance.
Prepared and restored fixed and non-fixed furniture in a number of classrooms. There were a number of control measures to adhere to whilst working in a live school environment.
PCT Main Central Cornwall Head Office – Alterations to 2nd and 3rd Floor.
Formation of the Chief Executive’s office, reconfigure the existing layout, provision of a private HR office to enable complete confidentiality, including all the necessary electrical and IT alterations.
Evolution did a great job, quick and clean and a very professional result.
Ian McAleer, NHS Kernow, KCCG Programme Lead, Establishment Programme
Crantock bay is a very prestigious project which Evolution have been lucky enough to be the interior fit out contractor providing insulation, sound and fire proofing as well as plaster boarding and skimming. The client expected a very high standard for this project in their 15 apartments, restaurant and swimming pool.
The Emerald is the UK’s first ever zero carbon holiday accommodation located just outside Carnon Downs in Cornwall.
Evolution have been instrumental in helping create the dream for husband and wife team Tim and Brigitte. The plan to create an environmentally friendly, five star self-catering holiday haven to rival luxury hotels with the freedom and privacy that self-catering allows was realised. The Emerald operates according to the Code for Sustainable Homes where they have been certified as Code Six which is the highest possible grading. They have achieved this by generating their own electricity, producing their own water, having very high levels of insulation, utilising recycled materials, recycling waste, planting native trees (over 100) and reducing the energy consumption of the Emerald by over 90%.
Evolution were delighted to be asked to work with The Emerald. In doing so we committed to minimising the impact on the environment by following their strict Environmental Policy and Waste Management Plan.
Evolution created and carried out interior works to create a new class 1 positive air pressure clean room our works included partitions, glazing, hygienic walls, suspended ceilings, kitchens, toilets, doors, associated carpentry and floor coverings.
Scope of works: Supply and install new suspended ceilings throughout, installed partitioning system to the clients design, installed fire separation blanket within the ceiling void.
Original scope of works: remove defective render, re-render the chimney stack and paint the new render.
Actual scope of works: remove defective render, hand demolish defective chimney stack on our client’s side, rebuilt in line with the structural engineers details, render the new brickwork and paint the new render. Due to the complexity and potential issues evolution instigated and introduced a Party Wall Surveyor immediately upon finding the issue on site. The property is privately owned in a conservation area.