Lanner School
Comments Off on Lanner SchoolEvolution supplied and installed new disabled ramp and hand rail as per client specifications.
Evolution supplied and installed new disabled ramp and hand rail as per client specifications.
The Card Factory project was in Peterborough and consisted of splitting a large warehouse with a jumbo stud fire partition wall 10m high and 40m long. Following this we installed all new ceilings and created offices. We also created a shop within the warehouse so that they could test out new ideas and layouts in there existing shops.
Scope of works: Evolution fully designed and installed the new facilities which includes office space, meeting room, two fully compliant disabled toilets and a kitchen breakout area.
Evolution carried out the full internal fit out on this project item included where ceilings and partitions doors and all associated wood work and integral glazed partitions with blinds and all carpet to all areas.
Evolution was the interior fit out company to the Porthminster Hotel (St Ives Harbour Hotel) new 16 luxury apartments and 4 no town houses within this we insulated boarded, skimmed and provided sound and fire proof ceilings to these prestigious properties.
Evolution carried out the full internal fit out which included suspended ceilings, partitions doors and woodwork and carpet to all areas.
no images were found
Evolution carried out the full internal fit out of this project which included suspended ceilings, partitions and dry lining.
Evolution designed and carried out all works to this shop fit which included suspended ceilings, partitions, feature bulkheads, shelving and flooring.
Evolution worked for Coastline at Miners Court.
The main project was to transform a “tired” building into Cornwall’s 1st Extra Care Scheme providing a vibrant and fresh look with excellent facilities for the residents and the local community. Also the 64 individual flats within the complex were upgraded with new kitchen and bathroom facilities, and a fully complaint DDA communal bathroom was formed with the very latest equipment installed.
The main works for Evolution were the installation of new suspended ceilings and lighting throughout, including: all the necessary electrical alterations and installing High-Tec low energy products, installing a special feature ceiling and lighting scheme to the main entrance, installing all the specified insulation and fire blankets/breaks so to ensure the building was compliant.
Part of the challenge was to ensure the residents and staff were kept safe at all times the works were carried out in a fully live environment, also ensuring the residents and staff were fully informed and involved during the works. Resident consultation was absolutely key, care and compassion was absolutely essential on a scheme of this nature.
The residents, staff and the client were very grateful for Evolution’s contribution in this successful project.