Recent Work

  1. National Trust, Helford

    Re-roofing project

    National Trust, Helford

    Re-roofing project on a stunning National Trust property situated in the Helford.

  2. Tremough Sports Centre

    Ceilings & partitions

    Tremough Sports Centre

    Tremough Sports Centre had its open day yesterday. Evolution installed all the ceilings & partitions for Midas.

  3. Camborne Science & International Academy

    External Works

    Camborne Science & International Academy

    Scope of works: re-render feature walls including a curved seating area and paint upon completion, repair and re-stain timber decking, install two new timber gate sets.  All works within the stunning feature area adjacent to the main entrance.

  4. Camborne Science & International Academy

    Classroom repairs

    Camborne Science & International Academy

    Prepared and restored fixed and non-fixed furniture in a number of classrooms. There were a number of control measures to adhere to whilst working in a live school environment.

  5. NHS, Sedgemoor

    Office reconfiguration

    NHS, Sedgemoor

    PCT Main Central Cornwall Head Office – Alterations to 2nd and 3rd Floor.

    Formation of the Chief Executive’s office, reconfigure the existing layout, provision of a private HR office to enable complete confidentiality, including all the necessary electrical and IT alterations.

    Evolution did a great job, quick and clean and a very professional result.
    Ian McAleer, NHS Kernow, KCCG Programme Lead, Establishment Programme

  6. Crantock Bay

    Interior fit out

    Crantock Bay

    Crantock bay is a very prestigious project which Evolution have been lucky enough to be the interior fit out contractor providing insulation, sound  and fire proofing as well as plaster boarding and skimming.  The client expected a very high standard for this project in their 15 apartments,  restaurant and swimming pool.

  7. The Emerald, Cornwall

    Zero Carbon Luxury holiday accommodation

    The Emerald, Cornwall

    The EmeraldThe Emerald is the UK’s first ever zero carbon holiday accommodation located just outside Carnon Downs in Cornwall.

    Evolution have been instrumental in helping create the dream for husband and wife team Tim and Brigitte.  The plan to create an environmentally friendly, five star self-catering holiday haven to rival luxury hotels with the freedom and privacy that self-catering allows was realised.  The Emerald operates according to the Code for Sustainable Homes where they have been certified as Code Six which is the highest possible grading.  They have achieved this by generating their own electricity, producing their own water, having very high levels of insulation, utilising recycled materials, recycling waste, planting native trees (over 100) and reducing the energy consumption of the Emerald by over 90%.

    Evolution were delighted to be asked to work with The Emerald.  In doing so we committed to minimising the impact on the environment by following their strict Environmental Policy and Waste Management Plan.

    www.emeraldcornwall.co.uk

     

  8. Research Instruments, Falmouth

    Interior works

    Research Instruments, Falmouth

    Evolution created and carried out interior works to create a new class 1 positive air pressure clean room our works included partitions, glazing, hygienic walls, suspended ceilings, kitchens, toilets, doors, associated carpentry and floor coverings.

  9. Bathroom Studio, Threemilestone

    Specialist Services

    Bathroom Studio, Threemilestone

    Scope of works: Supply and install new suspended ceilings throughout, installed partitioning system to the clients design, installed fire separation blanket within the ceiling void.

  10. 9 Falmouth Road, Truro

    Building and rendering works

    9 Falmouth Road, Truro

    Original scope of works: remove defective render, re-render the chimney stack and paint the new render.

    Actual scope of works: remove defective render, hand demolish defective chimney stack on our client’s side, rebuilt in line with the structural engineers details, render the new brickwork and paint the new render. Due to the complexity and potential issues evolution instigated and introduced a Party Wall Surveyor immediately upon finding the issue on site. The property is privately owned in a conservation area.